DIY Scaffold Tower

Discount Scaffold Tower Access Hire| Salford

DIY Scaffold Tower Hire Salford

We offer fibreglass/grp, aluminium, liftshaft scaffold towers for rent. Supplying scaffold towers in Salford and throughout Hertfordshire, The city of london and Essex. Access towers, bridging decks & much more, our wide range of towers and stagings are easy to erect, secure & certified.

Our company provides many other work stagings that are suited for very specific tasks. These tools feature low level stagings, self-propelled electrical platforms and many more.

Discount Aluminium Access Tower Hire

Folding Indoor Platforms

Scaffolding Tower you can gain access to fixtures to swap light bulbs or wash tall home windows in the great room. This specific Scaffolding Tower allows you to conveniently access tough to get to places to install acoustical or ceiling tiles, do electrical task or complete AIR CONDITIONER installation. Wheel from one end of the room to the other, for painting, patching, wallpapering and hanging plasterboard with eight 5 in. swivel locking casters. Which’s a significant help when you don’t have time to take down and reconstruct the scaffold. House owners and experts alike will value the 250kg. load capacity. That means you could effortlessly get two or more big men up there to assist with drywall setup or painting. A substantial, 66.5 in. L x 16.25 in. W, timber and aluminium deck offers a sturdy task surface. The Youngman Two Story Rolling Scaffold Tower unit includes everything you need to build a safe and secure interior scaffold unit, from the casters to the guard rail. Use a single or double deck, built upon the needs of the job. Whenever used as an individual story unit, the scaffold measures only one metre wide.

Discount Aluminium Access Tower Hire

Cantilever Systems Salford

4.2 Metre (13ft 10in) Alloy access tower rental with 850mm cantilever frames to get over obstructions at height. Double width tower offering a staging area of 1.80 metre by 1.45 metre. The level of the tower defined is the platform level, a guardrail equipment on the platform will definitely make the tower 1 metre higher. Offered with flexible locking wheels, safety toe-boards and stabilisers when needed. Our scaffolding towers come in many different varieties and models, according to exactly what is needed of them.

Span Access Platforms Safety measures

Basic hard hats and bump caps are needed when proper protection against falling items and overhanging obstructions is mandatory on the construction site. Safety Boots:

For necessary toe protection, specified reinforced footwear developed to BSEN345 is recommended. Safety Gloves:

A variety of gauntlets, PVC, pure cotton and rigger gloves suggested to provide essential hand safety

Salford Stairs alloy Towers

For a just one person tower, the MiTower performs it’s objective extremely well by providing access in restricted locations by having just one person being needed to set up or disassemble the tower. If a much larger tower is required, the MiTower Plus is readily available in a similar format but for two persons instead (due to its wider size).

Lift Shaft Towers Salford

Staging Level (m) Max. Safe Working Level (m) Tower Size (m) Max. Safe Working Load per Platform (kg) BoSS Liftshaft 7004m6m0.7 m275kg BoSS Lift Shaft 700 is the light-weight professional modular access tower unit, developed for use in confined spaces. The 61420400 confined space tower systems have a small base dimension 0.7 m wide and 4m platform level. Featuring Lift Shaft/ confined space stabiliser for maximum stability (available for platform heights from 4m to 20m).

700mm width and 1.3 m length for restricted spaces 250mm rung frames for effortless climbing Walkthrough portal frames for complete access below the tower SP4 stabilisers for restricted space Popular frame heights 2m, 1.5 m and 1m.

When space is limited, our 6.2 m Handrail Narrow Tower, 1.8 m Deck, can easily solve your access issues. This narrow width scafford tower is ideal for hallways and side elevations. Prices quoted to Salford are for Handrail level. Add 1m for working level. Where space is reduced, our 0.85 m slim width alloy towers can eliminate your access troubles.

Can we make it much higher by adding in extra components?

Yes indeed no problem. Simply say what exactly you require and we’ll ensure positive you get the gear you need to reach the right working platform height.

Is the level adjustable?

You bet it is. Add extra or fewer components to your needs. The platform can be placed in any place on the scaffold so give you the working height needed.

https://en.wikipedia.org/wiki/Scaffolding

Discount Scaffold Tower Access Hire| Ripon